Multidrill Drilling Machine - List of Manufacturers, Suppliers, Companies and Products

Multidrill Drilling Machine Product List

1~2 item / All 2 items

Displayed results

Multi-Drill Excavator 'SR-20'

Ready for immediate installation upon delivery to the site! A multi-drill excavator that can operate even in narrow spaces.

The SR-20 is a multi-drill excavator that can quickly raise and lower the mast using hydraulic power. It can be transported with the Kelly bar attached, significantly reducing the time before construction begins. Additionally, in recent urban redevelopment projects, it can handle everything from the removal of underground obstacles such as reinforced concrete and pre-cast piles to the construction of cast-in-place piles. 【Features】 - Engine (certified under the Off-Road Law special exception; designated as ultra-low noise construction machinery) - New hydraulic pump and new load sensing system - Powerful rotational torque - Construction management via touch screen monitor (DMS system) - Hydraulic mast raising and lowering (no need to remove the Kelly bar) *For more details, please download the PDF or feel free to contact us.

  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Steel Pipe Pile Removal Work Using SR-45 Multi-Drill Excavator

Proven track record of handling various projects! Case study of the SR-45 multi-drill rig.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Shibuya, Tokyo, we carried out the removal of steel pipe piles. We removed a steel pipe pile with a length of 15m that could not be extracted using the existing pile extraction method, utilizing the SR-45 multi-drill excavator. For more details about the case, please refer to the related link. 【Case Overview】 ■ Project Name: Removal of Steel Pipe Piles Using SR-45 Multi-Drill Excavator ■ Date of Construction: February 22, 2023 ■ Location: Shibuya, Tokyo *For more information, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration